Case study - Maintenance cost and risk reduced by 55%.
Maintenance cost and risk reduced by 55%.
Katoni: Make health and safety matter.
Katoni achieves ISO 45001 with LRQA. This case study states the preparation process from OHSAS 18001 to ISO 45001 Katoni took for a successful migration.
DB Schenker: Reaching a quality management milestone.
Reaching a quality management milestone. Certification to ISO 9001:2015, just a month after the revised standard’s publication. Read our case study.
UKCloud: Leading with information security.
ISO 27018 Statement of Verification for added confidence in Cloud services. Read more in our case study.
LRQA certifies Grab to ISO 9001:2015
Grab and LRQA pave the way with ISO 9001:2015 certification. Early certification to ISO 9001:2015 demonstrates quality leadership. Read our case study.
Training for Huadian Heavy Industries
Designing and delivering bespoke training with the RES Group for a leading Chinese EPC contractor. Read more in our case study.
Reducing risk with new plant equipment
Constructing a major new power plant is a high-risk, capital-intensive project. Our client, an established power plant operator in India, wanted support with the supply of equipment. Assets would come to the plant from Chinese vendors.
Enerpac: How remote inspection led to better customer experience.
When Enerpac needed a more flexible inspection solution to meet its client needs, LRQA responded with remote inspection technology.
Apache: acheiving global geoscience collaboration.
We worked with Apache Corporation's geoscientists to implement a customised LRQA IP platform enabling them to share and analyse subsurface data company-wide.
Inspection review for TANATEX Chemicals by LRQA
Reviewing and improving a chemical manufacturer’s compliance management system for robust inspection planning and reduced plant downtime. Read our case study.